Keller completed all work 3 weeks ahead of original schedule, below budget with no rework, while achieving an exceptional safety record of zero incidents on site.

Keller engaged early directly with Air Products, Technip and their geo-technical firm, Tetra-Tech EBA, to provide value engineering services, test piles and program design for the installation of over 920 CFA piles, saving the client 30-40% in execution costs and several months off of a tight schedule within a comprehensive end to end offering.

Supply and installation

  • 294 -760mm diameter CFA piles
  • 631 - 610mm diameter CFA piles
  • Pile tailings management, pile layout, as-built survey, inspection and concrete testing

All work was completed 3 weeks ahead of original schedule, below budget with no rework while achieving an exceptional safety record of zero incidents on site.

Project Facts

Owner

Air Products

Main Contractor(s)

Technip/EBA

Keller Business Unit(s)

Keller Foundations Ltd.

Engineer

Tetra-Tech EBA