Keller's sister company, Cyntech, installed helical piles to repair and remediate the foundation for Tank 22.

Cyntech Tank Services, a Keller company, was awarded a contract for complete Tank 22 repair and foundation remediation, including design, supply and install.

Supply and installation

  • Reinforced concrete ring beam with screw pile anchor supports
  • Complete mechanical repairs including floor plate replacement, floor annular ring supply and install; EFR leg/sleeve replacement, mechanical shoe seal installation
  • 3 water draws and floor sumps supply and install, roof sump, MESA drain install, pontoon repairs, rim angle supply and install
  • All tank coatings

All work was completed to specification within budget and agreed to revised schedule.

Project Facts

Owner

Enbridge Pipelines

Main Contractor(s)

Enbridge Pipelines

Keller Business Unit(s)

Cyntech

Engineer

N/A

Download Project Sheet

Enbridge Tank 22 Project Summary